To connect and fit a sophisticated MRI scanner into a copper lined room situated within a 19th century building that is Bedford Hospital.
We worked closely with SDC Builders, The Consultants and Client to prepare the room before delivery of the scanning equipment deadline.
The work involved included:
A modern facility that created a calm environment for the patients and visitors.
Download PDF for more details.
“Wady’s are a good subcontractor who produce quality work to a programme.”
SDC Construction Group
Lighting Cabling Inspection & Testing Power Security Systems Other
Emergency Lighting, PIR Controlled Lighting, Energy Efficient Lighting, Scene Set Lighting Singles, SWA’s, PVC, Control Cables, Data Periodic, Fire Alarm, Emergency Lighting, Portable appliances (PAT), Installation Mains Distribution, Sockets, Single & three phase outlets Fire Alarms, Intruder Alarms, CCTV, Lightning Protection TV & Satellite, Air Conditioning, Ventilation, Induction Loops, Nurse Call
Care Homes
Commercial
Domestic
Education
Health
Industrial
Maintenance Programs
Offices: New, Refits, Alterations
Rewires, New Build, Extensions
Schools, Extensions, Alterations
Hospitals, NHS, Private
Factory Units, Workshops, Garages